What should “done” tell us?

A message says the leak is fixed. What would let the person responsible check that the job is complete?

Products

Illustrative example. A landlord in Pamplemousses gets a message from her plumber: “Leak fixed, all good.” She pays him on the strength of it. Two weeks later her tenant calls to say the ceiling below the bathroom is wet again.

The plumber did go there, and he did tighten something. Whether it was the right something is a different question, and “all good” does not answer it.

Versions of this story are common wherever repairs are managed at a distance. The word “done” arrives easily, and it costs nothing to type.

Done is a claim

When a contractor types “done”, he is reporting what he believes about his own work. It is useful information. It is also the weakest form of evidence, because he has an interest in being finished and no one has checked.

The same applies to a work-order system with a status field. If anyone with access can change “in progress” to “done”, then the field records a wish. Reports built on it will say that eighty per cent of repairs are completed, and the number will be about as good as the typing.

The useful thing is a definition of complete that does not depend on the word.

A chain with checks

A repair has a sequence. Each step can be checked by someone, and the next step should wait for the check.

request -> scope -> quote -> approval -> before -> work -> after
        -> client confirmation -> close -> bill -> passport

The request says what is wrong. The scope and quote say what will be done and for how much. Approval means the person who pays has agreed. A before photograph shows the fault as it was. After the work, an after photograph shows the same place again. The client then confirms that the problem is gone, and only then is the job closed and billed.

The history goes into the property’s record, so that the next person to look at that ceiling can see it.

Why before and after

Pairs of photographs are among the cheapest strong evidence available. They answer two questions at once: was the fault real, and did the work address it? Taken at the same angle, with a date, they are hard to argue with.

A before photo also protects the contractor. If the client later says the damage was worse than found, or that a different wall was affected, the record shows the state on arrival. Both sides gain from it.

Who confirms

The most important step in the chain is probably the least glamorous. Client confirmation means that the person who asked for the repair says the problem is solved. A contractor cannot supply it, and neither can the system.

It may be the tenant, who lives under the ceiling. It may be the owner, who inspects. It may be the manager, acting for them. Whoever it is, the confirmation is a human act with a name and a time on it.

Confirmation may also be partial: fixed, but the paintwork is not restored. A good system lets someone say that, and keep the job open for the remaining item, so that “mostly done” is not rounded up.

What the typed word does to a business

When “done” is trusted, errors become structural. Contractors learn that the fastest way to clear a queue is to type the word. Managers report completion rates that are not true. Owners pay for work they cannot verify.

Then comes the repeat visit. A leak that is not fixed returns, and a second callout is billed. The owner has paid twice. If the first visit had to be evidenced and confirmed, the weakness would have appeared in a day instead of a fortnight.

There is a quieter cost to the building. Its record now contains an entry that says a repair was completed, when it was not. Future decisions will rest on that. The record can be corrected with a new entry that points back to the old one, but a correction is better made early.

Reasonable objections

A contractor on a ladder in the rain does not want to photograph things and wait for confirmation. That is true, and a system that makes his life harder will be bypassed. The steps should be quick: a camera tap, a message to the client, a reply of “yes”. Work already being done should produce the record as a side effect.

Another objection is that clients will not confirm. They get busy. A sensible system sends a reminder and, after a stated time, flags the job as unconfirmed, and does not guess at silence. An unconfirmed job is a different state from a confirmed one, and reports should show both.

The definition

A repair is complete when evidence shows the work, the client says the problem is gone, and the record is closed with both attached. Anything short of that is a contractor’s opinion, which counts for something and does not close a job.

Availability and limits (13 October 2026)

Edifia’s source code, as reviewed on 2 October 2026, requires contractors to supply before and after photos and has job statuses running from estimated, quoted and scheduled through in progress and submitted to done, with cancelled as another ending. Its design notes say a job is never closed automatically and include a client-confirmed step. The whole chain above has not been seen operating end to end, so it is described here as design. Edifia Ltd confirms its own services as a separate seller; see the Edifia page.

Ask Innerverse

Guided answers from our website. This is not a live conversation with a person.